Project profiles

Oil refinery - Stoke on Trent

Full installation of process plant and tank farm for complete lubricating oil reprocessing pilot plant. Main mechanical and plant contractor on greenfield site, from site establishment to completion of system commissioning.
Value: £140,000

Motorway structural repairs

Fabrication and erection of temporary support steelwork for Midland Links Motorway refurbishment work.
Value: £48,000

Chemical process plant, W'hampton

Structural steel refurbishment to platforms around stacks and process tanks. Working to petroleum/chemical industry codes of practice. Replacement of fire mains and process pipework. Ongoing general fabrication and process pipework repairs. Ongoing maintenance to process tanks.
Value: £40,000

Brick manufacturer

Total tunnel kiln refurbishment including new installation of stainless steel lining, replacement of gas supply to burners, fabrication, replacement and cladding of 800mm ? ductwork.
Value: £158,000

Total fabrication of crocodile kiln and kiln cars, followed by installation and commissioning of complete mechanical handling and process plant.
Value: £95,000

Steel Process Plant

General steel fabrications to detail drawings, all parts to ISO 9002 quality.
Value: £48,000

Leisure Industry

Tube fabrications for Aqua slide supports finish hot dipped galvanized.
Value: £96,000

Car Finishing Plant

General fabrications in mild steel and stainless steel under a design and build contract on auto cad release 12/13 for auto manufacturers.
Value: £80,000

Construction Industry

Manufacture steel canopies and squire box portal frames for RAF Cosford installation with 15 ton crane parts designed using auto cad 13.
Value: £15,000

Brick Manufacturer

Manufacture stainless steel roof panels for the repair to tunnel kiln roof by ourselves. Work carried out in Christmas shutdown to allow production to carry on without losses.
Value: £28,500
Manufacture of kiln hanger brackets in 316 stainless steel and supply of labour for the removal of suspended refractory roof and replacement, carried out on short-term project.
Value: £16,000

 


Brick manufacturer cont.

Manufacture steel parts for the repair to 42 kiln cars. On-site installation by removal of old brick and slabbing cutting with oxy and acetylene steel frame and install new parts. Rebuild with new bricks and slabs.
Value: £34,000

Fabrication and installation of walkways, fabrication of 35 tons of fan support steel to support 2 off 3.5 ton process drying fans, general handrailing and guarding.
Value: £42,000

Roof Tiles Manufacturer

Design and manufacture of clay shredding machinery, design and installation of tile cutting machines, refurbishment of double shaft mixer, fabrication and installation of access platforms, guarding modifications to meet BS 5304.
Value: £110,000

Water industry

Fabrication of specialized compression rings for high-pressure water supply. Rings to comply with water industry by-laws.
Value: £25,000

Fabrication and installation of galvanized walkways in sewerage treatment plant.
Value: £20,000

Sugar process plant

Fabrication and installation of pipework and galvanized walkways to effluent treatment plant. Work carried out to quality assurance system.
Value: £35,000

Construction Industry

Manufacture and installation of steelwork for the extension of Mallory Court Hotel, Warwick. Total tons 24.
Value: £27,600

Construction Industry

Manufacture and installation of steelwork for the extension of Coombe Abbey, Coventry. Total tons 12.
Value: £19,800

Construction Industry

Manufacture and installation of tube fabrications to support a 400-ton concrete roof. Manufacture and installation of a glazing system powder-coated to support plate glass to form pedestrian shelters.
Value: £380,000

Construction Industry

Manufacture and installation of steel framing for the Wolverhampton Civic Hall refurbishment.
Value: £420,000